Quality & Demand Gates for AI & marketing

Quality Gates ask whether an AI output meets your standard. Demand Gates ask whether a marketing channel brings enough demand. Both stop when the answer is no.

Marketing channels should only run with enough demand.

Demand Gates provide defined pass conditions per route to market. Small tests will run against it with KPIs defined in advance. Whatever fails gets switched off, before the large budget moves.

Contact

Organic costs time, paid ads costs money.

You have budget, so you buy reach. That works as long as you keep paying. But with no organic base, every contact is bought at full price. And the price rises with competition.

Or go organic first. Then it takes months. You need several platforms at once, content flowing continuously, video, social, newsletter, articles. That cannot be caught up in a quarter.

Choosing between them is the wrong question. I build Demand Gates to identify marketing channels that show substantial demand for your business. Everything else should not get any budget.

A good strategy is nice, sustainable marketing channels are better.

Everyone knows by now that organic and paid belong interlocked. It is in every agency pitch. But marketing still dies in the same place almost everywhere.

The strategy demands several platforms, several angles per platform, video, social, newsletter and written content flowing continuously. That is not a concept problem, it is a production problem. It usually dies in month two, when the stockpile runs out and the day job comes back.

So I am not selling you a strategy. You get one free in every pitch. What is missing is the production that keeps it alive past month two.

How a Demand Gate runs

PhaseWhat happensPrice
1First call 45 minutes. Where you stand, what the goal is, whether that is realistic. free
2Specification A record built on your real numbers, buyers and routes named, a capacity calculation. The result is a plan with an order to it. 3,500 euros
3Platform tests Four to six weeks. Small tests across several routes, measured against conditions fixed up front. The result is the answer to which route carries in your case and what a contact costs there. 6,000 euros
4Content pipeline The production line for the routes that passed. fixed price, set by phase 3
5Operation The line runs. I operate it and measure against the conditions from phase 2. 3,500 to 6,000 euros per month, cancellable monthly

You can stop after any phase. The media budget for the tests runs through you, not through me, so plan for 2,000 to 5,000 euros. All prices exclude VAT.

Let's talk about where you stand and where your budget is currently burning.

Contact

Quality Assurance, before uncomfortable questions arrive.

I write the Quality Gate as a script. It runs before delivery and holds it back when an output misses the standard. What it checks is set by your product and your evidence obligations.

It is needed wherever an AI produces something a client, an auditor or a court gets to see, and where you answer for every sentence in it. Not because AI is often wrong, but because nobody notices when it is: a system that was right yesterday and misses something today does not raise its hand, it keeps delivering. A gate moves the control from the spot check to the rule, automatically, traceably and every time.

Contact

How a Quality Gate runs

PhaseWhat happensPrice
1First call 45 minutes. What the case is, what is at stake, whether this is worth doing at all. free
2Specification Sessions with your specialists, one visit on site, a record of the current state. The result is the specification of your gate and a fixed price for the build. 4,500 euros, 6,500 in regulated domains
3Build The gate gets built, installed and handed over, until it runs. fixed price, set by the specification
4Review Once a quarter the gate runs against everything that changed. Report and corrections. 2,500 euros per quarter, optional

You can stop after any phase and keep what you have. The specification from phase 2 holds its value even if somebody else builds it. All prices exclude VAT.

What you keep, even if you stop

  • After the design phase. The written specification: what “correct” means for each of your output types, which conditions are checked against it, which of those run automatically and which a person answers. Plus the fixed price for the build.
  • After the build. The running gate inside your environment. You can read the code, hand it on and run it without me. Plus evidence an auditor reads without running your model again.
  • After each review. A report on what changed and what failed because of it.

You end up with something you can show to someone. And something that can fail.

Contact